Formative Evaluator's Report: Bridging the Gap, Phase II (Appendices)
  1. Maintenance of Equipment (On-Going)
    • Greenhouse Structure (Quanzit and Gutter Connected)
      1. Repair tears in the Durafilm
      2. Tighten/replace loose bolts
      3. Build up sinking floor as necessary
      4. Remove snow
    • Fans (ventilating and circulating)
      1. Inspect and replace worn belts
      2. Adjust tensions
      3. Oil motors and bearings
    • Furnace
      1. Inspect and clean/replace nozzles, electrodes, filters, fuel lines, vents
      2. Adjust fuel and air intake if necessary
      3. Adjust electrodes if necessary
      4. Check fuel supply system
        - Main Storage Tanks
        - Interim Storage Tank
      5. Check fuel supply
    • Pumps
      1. Clean filters and remove debris
      2. Replace faulty pumps
    • Irrigation System
      1. Inspect and clean filters
      2. Inspect all pipe and tubing lines for leaks
      3. Replace broken drippers
      4. Test run to verify function of drippers