3. Before the Digging Starts
Planning the excavation – risk assessment
Call utilities before you dig
Call workplace Safety & Health Division
4. General Safety Requirements
PPE
Site set up
Traffic control around the site
Public safety (barricading)
Access/egress
Engineering approvals
info on site
Hoisting equipment
5. Types of Soil Collapse
Zone of exposure
side wall shear
cave-in
rotation
spoil pile
Next Page
Previous Page
Table of Contents